联系人8个
立即查看
可引荐人脉846人
立即引荐
历史招中标信息73条
立即监控
联系人8个
立即查看
可引荐人脉846人
立即引荐
历史招中标信息73条
立即监控
中色卢安夏新矿项目(二期)井巷**、地表**及采矿工程采购项目标段一公开招标(自愿)公告
发布时间:
11/25/2026,05:50:00(中国**)
文件获取截止时间 : 12/13/2026,23:00:00(中国**)
1.招标条件
1. About the Tender
Tender project description: Luanshya New Mine Project (Phase II) – Underground Mine Development and Construction, Surface Construction and Installation, and Mining Works.(Tender Documents No.:****点击查看). Employer: CNMC Luanshya Copper Mines PLC of this tender project come from self-raised funds, and the proportion of capital contribution is 100%.The Employer entrusts CNIT ZAMBIA LIMITED to be responsible for the issuance of tender notices, clarification of questions and answers, tender opening, and tender announcement, The project has met the tender conditions and is now open for inviting tenders.
2.项目概况和招标范围
2. Description and scope of tender
2.1项目概况和招标范围
Description and scope of tender
2.1.1工程名称:中色卢安夏新矿项目(二期)井巷**、地表**及采矿工程。
Name of the Project: Luanshya New Mine Project (Phase II) – Underground Mine Development and Construction, Surface Construction and Installation, and Mining Works.
2.1.2工程地点:赞比亚铜带省卢安夏市。
Location of the Project: Luanshya City, Copperbelt Province, Zambia.
2.1.3工程内容:基建工程包括中色卢安夏新矿深部井巷**工程、深部井巷工程配套相关地表**工程及特殊临时设施工程;采矿工程包含深部及浅部开拓、采准、采矿(回采)及支护工程。
Scope of Works:The mine development and construction works include the deep underground mine development and construction works of CNMC Luanshya New Mine, the associated surface construction and installation works supporting the deep underground mine development, and special temporary facilities works.
The mining works include deep and shallow mine development, mine preparation, ore extraction (stoping), and ground support works..
2.1.4工程的标段划分:本项目共分为三个标段,标段一为基建工程+采矿工程,标段二为基建工程+采矿工程,标段三为采矿工程。投标人可投标其中一个标段或全部标段,不限制同一投标人中标的标段数量。
Bid Section Division of the Project:The Project is divided into three lots: Lot 1 comprises mine development and construction works and mining works; Lot 2 comprises mine development and construction works and mining works; and Lot 3 comprises mining works only. Bidders may bid for one or all lots, and there is no limit on the number of lots that may be awarded to the same bidder.
2.1.5招标范围:
Scope of Tender
2.1.5.1标段一招标范围:Scope of Works for Lot 1
(1)基建工程主要内容:主井掘砌、22#回风井利旧延深、胶带斜井掘砌、盲进风井掘砌,盲进风管缆井掘砌、中段掘砌、斜坡道扩刷、清淤等相关井巷**工程、地表**工程、特殊临时设施工程等。合计掘进量约21.31万m3;混凝土支护量约6.49万m3。
(2)采矿工程主要内容:穆西**、深部**、玛希巴80-120ml及其他发包人要求的区域的相关采准、采矿、支护工程,合计采准量约19.09万m3;采矿量约130万t。
(1) Main Scope of Construction Works – Section 1
Infrastructure construction works: The main works include excavation and construction of the main shaft; refurbishment and deepening of the existing No. 22 return air shaft; excavation and construction of the belt inclined shaft; excavation and construction of the blind intake air shaft and blind intake air pipe and cable shaft; excavation and construction of level tunnels; enlargement and rehabilitation of the decline; desilting and other related underground development and construction/installation works; surface construction and installation works; and special temporary facilities.
The total estimated excavation volume is approximately 213,100 m3, with a concrete support volume of approximately 64,900 m3.
(2)Mining works: The scope covers related development, stope preparation, mining and ground support works in the Muxi Mining Area, Deep Western Area, the 80–120 mL section of the Mashiba Mining Area, and other areas designated by the Employer.
The total estimated development and preparation volume is approximately 190,900 m3, with an estimated mining output of approximately 1.3 million tonnes.
2.1.5.2标段二招标范围:Scope of Works for Lot 2
(1)基建工程主要内容:28#井利旧修复、胶带斜井掘砌、盲进风井掘砌,盲进风管缆井掘砌、中段掘砌、斜坡道扩刷、清淤等相关井巷**工程、地表**工程、特殊临时设施工程等。合计掘进量约17.07万m3;支护量约1.33万m3。
(2)采矿工程主要内容:穆东**、深部**及其他发包人要求的区域的相关采准、采矿、支护工程,合计采准量约16.90万m3;采矿量约130万t。
(1) Main Scope of Construction Works
The main works include refurbishment and rehabilitation of the existing No. 28 shaft; excavation and construction of the belt inclined shaft; excavation and construction of the blind intake air shaft and blind intake air pipe and cable shaft; excavation and construction of level tunnels; enlargement and rehabilitation of the decline; desilting and other related underground development and construction/installation works; surface construction and installation works; and special temporary facilities.
The total estimated excavation volume is approximately 170,700 m3, with a support volume of approximately 13,300 m3.
(2) Mining Works
The scope covers related development, stope preparation, mining and ground support works in the Mudong Mining Area, Deep Eastern Area, and other areas designated by the Employer.
The total estimated development and preparation volume is approximately 169,000 m3, with an estimated mining output of approximately 1.3 million tonnes.
2.1.5.3标段三招标范围:Scope of Works for Lot 3
(1)采矿工程主要内容:玛希巴120-340mL区域及其他发包人要求的区域的相关开拓、采准、采矿、支护工程,合计采准量约25.10万m3;采矿量约200万t。
.(1) Mining Works
The scope covers related mine development, stope preparation, mining and ground support works in the 120–340 mL section of the Mashiba Mining Area and other areas designated by the Employer.
The total estimated development and preparation volume is approximately 251,000 m3, with an estimated mining output of approximately 2 million tonnes.
三个标段具体内容详见工程量清单。
The detailed scope of works for each of the three lots is provided in the respective Bills of Quantities (BoQs).
2.2 工期要求:
Construction Period Requirements
标段一:总工期1460日历天。基建工程工期节点要求:新主井工程2027年12月31日前掘砌至井深760mL,2028年8月31日前掘砌到底;22#东翼回风井2027年7月31日前完成井筒延伸。采矿工程工期730日历天。全部工程于2030年12月31日前完工。
Lot 1: The overall contract duration shall be 1,460 calendar days.Key Milestones for Infrastructure Construction:
New Main Shaft: Shaft sinking and lining works shall reach a depth of 760 mL by December 31, 2027, and shall be completed to the final shaft depth by August 31, 2028.****点击查看. 22 East Wing Return Air Shaft: Shaft extension works shall be completed by July 31, 2027.Mining Works: The construction period for mining works shall be 730 calendar days.Overall Completion: All works shall be completed by December 31, 2030.
标段二:总工期1460日历天。基建工程工期节点要求:28#副井2027年12月31日前完成井筒拆除,2029年10月31日前永久安装工程结束。采矿工程工期730日历天。全部工程于2030年12月31日前完工。
Lot 2: The overall contract duration shall be 1,460 calendar days.Key Milestones for Infrastructure Construction:
No. 28 Auxiliary Shaft: Shaft dismantling works shall be completed by December 31, 2027, and permanent installation works shall be completed by October 31, 2029.Mining Works: The construction period for mining works shall be 730 calendar days.Overall Completion: All works shall be completed by December 31, 2030.
标段三:总工期1200日历天。
Lot 3: The overall contract duration shall be 1,200 calendar days.
具体开工日期以发包人批准的开工报告载明日期为准。
The actual commencement date shall be subject to the date specified in the Notice to Commence approved by the Employer.
3 投标人资质等级、人员及相关要求
3 Bidder Qualification Requirements, Personnel Requirements and Other Relevant Requirements
The Tenderer shall provide documents to demonstrate it is a legal enterprise and qualified for the Tender and has the capability to perform the contract after winning the Tender, which shall include but not limited to:
3.1.1 在赞公司独立注册证书复印件;
3.1.1 A copy of Replacement Certificate of incorporation of a private company limited by shares);
3.1.2 在赞公司PACRA登记信息复印件。
3.1.2 PACRA registration information printout for the company in Zambia.
3.1.3近一年财务报表或完税证明;
3.1.3 The company's balance sheet, profit and loss statement, and cash flow statement for the past one year and tax clearance;
3.1.4纳税人识别号登记复印件;
3.1.4 Copies of TAXPAYER IDENTIFICATION NUMBER REGISTRATION
3.1.5赞比亚NCC颁发的处于有效期内的注册证书。
3.1.5 A valid registration certificate issued by the National Council for Construction (NCC) of Zambia.
3.2拟派驻本项目的负责人具备:The proposed person in charge of the Project shall possess
具备矿业工程专业一级注册建造师执业资格,或符合 EIZ 对工程项目管理或相关工程专业人员的注册、会员资格或执业资格要求。
Shall hold a Class 1 Registered Constructor qualification in Mining Engineering, or meet the EIZ registration, membership or professional qualification requirements for engineering project management or a related engineering discipline.
3.3其他要求:
1) 投标人必须是具有独立承担民事责任能力的在赞比亚境内注册的法人或非法人组织;
1) The Tenderer must be a legal or unincorporated organization registered in Zambia with the ability to assume civil liability independently.
2) 具有良好的信誉及履行合同的能力,资金财务状况良好;没有处于被责令停业,投标资格被取消,财产被接管、冻结,破产状态;
2) The Tenderer shall have a good reputation, the capability to perform the contract and sound capital and financial conditions; and is not at the state of business suspension under an order, disqualification for Tender, or properties being seized, frozen or bankrupted;
3) 在最近三年内没有骗取中标和严重违约及诉讼问题;
3) The Tenderer hasn’t defrauded to win a Tender or seriously violated a contract or had litigation issues within the last three years.
4) 投标人的资质证书中法人单位名称须和投标人营业执照名称相同,若名称不一致时应提供必要的澄清文件,但必须保证资质证书中的名称和营业执照名称实质上为同一个企业;
4) The name of the legal person on the qualification certificate of the Tenderer shall be identical to that on its business license, a clarification document shall be provided in the case of discrepancy, but it must guarantee that the name on the qualification certificate is substantially the same enterprise as that on the business license.
5)投标人单位负责人为同一人或者存在控股、管理关系的不同单位,不得同时参加本招标项目投标;
5) Different entities whose legal representatives are the same person, or that have holding or management relationships with each other, shall not participate in the tender for this project simultaneously.
6) 本项目不接受联合体投标,投标人必须向招标代理人购买招标文件并登记备案,未向招标代理人购买招标文件并登记备案的潜在投标人均无资格参加本次投标;
6) This Project does not accept consortium tender. Tenderers must purchase the Tender Documents from the Tenderee agent and be registered, and any potential Tenderer that has not purchased the Tender Documents from the Tenderee agent and not been registered would not be qualified for the Tender;
7) 投标人应遵守赞比亚相关法律和法规和本招标文件的规定。
7) Tenderers shall observe the Law of Zambia on Tender and other relevant laws and regulations of Zambia.
8)本项目未经允许不得进行转包,一经发现招标方有权取消中标人的资格并追究责任;
8) The Project shall not be subcontracted without permission, otherwise the tenderer shall have the right to cancel the qualification of the successful Tenderer and the Tenderer shall be pursued for any legal liability.
9)能签订《公司供应商承诺书》;
9)Capable of signing the Corporate Supplier Commitment Letter.
4 招标文件的获取
4 Acquisition of Tender Documents
4.1 凡有意参加投标者,请于2026年11月24日17时00分至2026年12月13日17时00分(赞比亚时间,下同),****点击查看集团采购招标电子商务平台(https://globalecp.****点击查看.cn)(以下简称平台)下载电子招标文件。
4.1 Any interested bidder shall log on to the CNMC Procurement and Tendering Ecommerce Platform () (hereinafter referred to as the Platform) to download the electronic tender documents from 17:00 on [24 November ] , 2026 to 17:00 on [13 December ] , 2026 (Zambia Time, the same hereinafter).
4.2本项目招标不收取标书费。
4.2 No tender document fee shall be charged for this project tender
5 投标文件的递交
5 Submission of Bid Documents
5.1 递交投标文件的截止时间(投标截止时间)为2026年12月14日9时30分。
5.1 The deadline for submission of bid documents (bid closing time) is 09:30 on [14 December ] , 2026.
投标人应当在截止时间前通过平台(网址:****点击查看集团采购招标电子商务平台 (https://globalecp.****点击查看.cn)上传,并保存文件上传成功回执,递交时间即为上传成功回执时间。
Bidders shall upload the documents via the Platform (CNMC Procurement and Tendering Ecommerce Platform, URL: ) prior to the deadline, and keep the receipt of successful file upload. The submission time shall be the time indicated on the successfulupload receipt
5.2 逾期未上传成功的投标文件,招标人不予受理。
5.2 Bid documents that fail to be uploaded successfully after the deadline shall not be accepted by the Tenderer
*5.3投标文件要求
5.3 Tender Documents Requirements
投标人准备的投标文件及与投标过程中的通信都应以中英两种语言书写,如出现描述不一致的情况,以中文为准。
The tender documents prepared by the tenderer and the communication during the tender process shall be written in both Chinese and English. In case of any discrepancy in two languages, the Chinese version shall prevail.
6 开标时间、地点
6 Bid Opening Time and Venue
6.1 开标时间:2026年12月14日9时30分
6.1 Bid Opening Time: 09:30 on [14 December ] , 2026
6.2 开标地点:平台线上开标
6.2 Bid Opening Venue: Online bid opening on the Platform
6.3 投标人不用到现场,但仍需在线参加开标过程。在开标时间前,招标人或招标代理机构会开启远程开标大厅,投标人须****点击查看集团采购招标电子商务平台(https://globalecp.****点击查看.cn),点击“在线签到”。开标时间则截止签到,招标代理人开启远程解密,投标人点击“一键解密”解密标书,系统开始唱标。
6.3 Bidders are not required to be present onsite, but shall participate in the bidopening process online. Prior to the bid opening time, the Tenderer or the tendering agency will activate the remote bidopening hall. Bidders shall log in to the CNMC Procurement and Tendering Ecommerce Platform () and click "Online Checkin". Checkin shall be closed upon the bid opening time. The tendering agent shall initiate remote decryption, and bidders shall click "Oneclick Decryption" to decrypt bid documents, then the system will start bid reading.
7 发布公告的媒介
7 Media for Announcement Release
本次招标公****点击查看集团采购招标电子商务平台 (https://globalecp.****点击查看.cn)及微信公众号(中色非采)上发布。
This tender announcement is simultaneously released on the CNMC Procurement and Tendering Ecommerce Platform () and the WeChat Official Account “CNMC Africa Procurement”.
8 联系方式:
8 Contact information
招标人:****点击查看
Employer:CNMC Luanshya Copper Mines PLC
电话 Tel.: 260****点击查看59808
招标联系人:李卓越
Bidding Contact Person: Li Zhuoyue
电话 Tel.: 260****点击查看52476
邮箱 E-mail:lizhuoyue@cnit.****点击查看.cn
9 质疑及投诉
9 Inquiries and Complaints
9.1 投标人或其他利害关系人可以以书面形式或通过电子邮箱向招标人或招标代理机构提出质疑异议。
9.1 Bidders or other interested parties may submit inquiries and objections to the Tenderer or tendering agency in written form or via email.
9.2 供应商提出质疑应当提交质疑函和必要的证明材料。质疑函应当包括下列内容:
Suppliers submitting inquiries shall submit an inquiry letter and necessary supporting documents. The inquiry letter shall contain the following contents:
1.供应商的姓名或者名称、地址、联系人及联系电话;
The name of the supplier, address, contact person and contact telephone number;
Name and number of the inquired project;
Clear specific claims and factual basis;
Date of submission of the inquiry。
供应商为法人或者其他组织的,应当由法定代表人、主要负责人或者其授权代表签字或者盖章,并加盖公章。
Where the supplier is a legal person or other organization, the inquiry letter shall be signed or sealed by the legal representative, principal personincharge or authorized representative, and affixed with the official seal.
9.3 联系方式
9.3 Contact information
电子邮件:****点击查看@gmail.com
E-mail:****点击查看@gmail.com
联系人:邢兆斌
Contact Person: Xing Zhaobin
联系电话:260****点击查看20861
TEL:260****点击查看20861
10 ****点击查看集团采购招标电子商务平台的使用说明
10 Instructions for Use of CNMC Procurement and Tendering Ecommerce Platform
10.1 首次使用平台的潜在投标人,****点击查看集团采购招标电子商务平台(https://globalecp.****点击查看.cn)主页点击“供应商注册”完成注册登录,即可参与公开招投标。
10.1 Potential bidders using the Platform for the first time shall log on to the homepage of the CNMC Procurement and Tendering Ecommerce Platform (), click "Supplier Registration" on the right side to complete registration and login, so as to participate in public bidding activities.
10.2投标人在平台使用过程中遇到任何技术问题请联系招标人。
10.2 If bidders encounter any technical problems during the use of the Platform, please contact the Tenderer.
****点击查看
CNIT ZAMBIA LIMITED
相关附件
公告.pdf 立即下载
招标公告.pdf 立即下载